Most of Highland Village was built out in the 1980s, ’90s and early 2000s, and a lot of those houses share the same kind of roof: steep, tall, and cut up with gables, valleys, dormers and a chimney or two. That’s a hard roof for shingles. Valleys wear out first, hail hits the steep faces hard, and every dormer is another place for water to find. When the shingles on one of those houses are done, more owners here are asking me about a full standing seam roof.
I’m Blake Snow. I’ve been roofing for 30 years, I’m the third generation in a family business that goes back 75 years, and our crews have completed over $80 million in roofing projects. We form standing seam and R-panel on our own roll formers in 24 or 26 gauge, and our own crews install them. If you’re still deciding between a full metal roof and metal accents over the porch and bays, start with my post on standing seam and metal accents in Highland Village and Flower Mound. This post is for owners who have decided on the full roof and want to know what it takes on a Highland Village house.
The short answer
- Steep, cut-up roofs can absolutely take standing seam, but the valleys, dormers, chimneys and walls are where the labor and the leak risk are. The flashing is the job.
- Hail is a real factor here. NOAA records show several storms with 2- to 3-inch hail within a couple of miles of town since 2016. Plan the roof with that in mind.
- The city permit, contractor registration and HOA approval all have to line up before panels go on. We handle all three.
- Metal lead time is typically one to two weeks, so the whole job usually moves faster than people expect.
Why Highland Village rooflines are different
A ranch house in Wise County might be four planes and a ridge. A two-story house off FM 407 or near the lake might be twenty planes, six valleys, two dormers, a chimney chase and a low back porch tied in under a second-story wall. Here’s how that changes a standing seam job:
- Valleys. Each valley gets a formed metal valley pan, and every panel that lands in it is cut on an angle and hemmed so water can’t wick back under. Done well, a metal valley is far better than a worn shingle valley. Done badly, it’s where the leaks start.
- Dormers and walls. Where a roof plane meets a second-story wall, we bend sidewall and headwall flashing for the panel and tuck it behind the siding or into the brick. No caulk-only joints.
- Chimneys. Brick and stone chimneys get a back pan or cricket on the high side and counter-flashing into the masonry. See my post on metal roof flashing details.
- Steep pitch. Tall roofs mean more safety setup and more time per square. It’s worth paying for a crew that does steep metal every week.
- Low back porches. Many homes have a back porch or patio at a lower pitch than the main roof. Mechanically seamed panels handle lower slopes better than snap-lock. See snap-lock vs. mechanical lock.
Hail around Highland Village
NOAA’s Storm Events Database lists 55 reports of hail 1.75 inches (golf-ball size) or larger within about 10 miles of Highland Village from 2016 through its September 2026 update. Some of the biggest storms came right through town:
- March 14, 2024: NOAA lists 2-inch hail less than a mile from the center of Highland Village, and 3.5-inch hail near Bartonville, under three miles away.
- June 11, 2023: 3-inch hail about a mile and a half from the center of town, 2-inch hail within a mile, and 4.25-inch hail near Bartonville.
- March 26, 2017: 2.75-inch hail about two and a half miles away on the Lewisville side, and 4.25-inch hail at Corinth.
I’ll be straight with you: hail that size can dent any metal roof. What metal doesn’t do is crack, split or shed granules like an asphalt shingle, and 24- or 26-gauge panels dent less than the thin panels on budget buildings. Before you choose, ask your insurance company how they treat metal roofs and cosmetic dents, and read our page on Class 4 metal roofs and insurance and my post on metal roofs and hail. If a storm already came through, start with our Highland Village storm damage page. In Texas you generally have 1 year from the date of loss to file a claim, but check your policy.
Permits and HOA in Highland Village
The city’s permit page says permits are required before any new construction, addition, alteration or repair of an existing building. For a re-roof, here’s what that means:
- Registered contractors pull the permit through the city’s online portal. The city tells owners to ask to see the permit before work starts. We’ll show it to you.
- Registration runs by fiscal year. The city’s contractor registration runs October 1 through September 30 and requires a copy of current liability insurance.
- The permit has to be posted on site, and every roof permit needs a final inspection.
- Most applications take up to ten business days, according to the city.
- HOA approval is separate. The city notes its approval doesn’t override deed restrictions or your HOA. We put together the HOA packet with product sheets and color samples and get that approval in writing before panels are ordered.
A full standing seam re-roof, step by step
- Free digital photo report. I walk the roof and photograph every slope, valley, wall and penetration, and measure every plane and pitch.
- Pick profile and color. We hold real samples against your brick, stone and trim in daylight. Dark bronze, charcoal and black are common here. See metal roof colors and finishes.
- Paperwork. We file the city permit and the HOA packet the week you sign.
- Form the panels. Our roll formers run each panel to the exact length of its run, so most planes have no end laps.
- Tear-off and decking. We strip to the deck, replace any soft or damaged decking, and dry the house in with high-temperature underlayment the same day.
- Trim, valleys and flashing first, then panels on clips that let the steel move with Texas heat and cold. See hidden fasteners vs. exposed screws.
- Final inspection and walk-through. The city signs off, and I walk the job with you.
My post on switching from shingles to standing seam goes deeper on each step.
Why Highland Village owners call us
- Our own roll formers and our own crews for standing seam and R-panel, 24 or 26 gauge.
- Metal lead time is typically one to two weeks.
- Certified with GAF, CertainTeed, Owens Corning, Atlas, Johns Manville, Carlisle, Tropical Roofing Products, Mule-Hide and Enviroshake, and many other roof manufacturers.
- 5.0 stars on Google at all three offices: Bridgeport, Decatur and Rhome.
- BBB A+ rated.
- Workmanship warranty from 10 years up to lifetime, depending on the job.
See our Highland Village standing seam page and metal roofing in Highland Village. We also work in nearby Flower Mound, Lewisville, Lake Dallas, Double Oak and Copper Canyon. If you’d rather have the look of shake or tile in metal, see stone-coated steel.
Get a standing seam estimate in Highland Village
Whether your shingles are worn out, a storm just came through, or you’re planning ahead, I’m glad to come out and look. Every estimate starts with a free digital photo report. Request an estimate or call (817) 733-9228.

