Snow Roofing & Exteriors logo Call (817) 733-9228
Texas · Metal building re-roof

Metal Building Re-Roof: R-Panel Replacement and Retrofit

A metal building re-roof in Texas usually starts with one question: can the old R-panel be saved, covered over, or does it come off? Snow Roofing & Exteriors re-roofs warehouses, shops, gyms and family life centers, ag and storage buildings, and we form the new R-panel, PBR or standing seam on our own roll formers in 24 or 26 gauge, cut to the length of each run.
  • Metal roofs for barns, shops and barndominiums
  • R-panel formed on our own roll formers
  • 24 or 26 gauge steel in many colors
  • Free estimate, with no pressure
Illustration of a roofing crew feeding a metal panel from a portable roll former on a commercial job site
Illustration

Four ways to re-roof a metal building

OptionWhen it fitsWhat you get
Re-screw and sealPanels sound; leaks at worn fasteners and lapsNew fasteners, sealed laps and trim; see re-screw vs re-panel
CoatPanels sound, finish aging, light rustA restoration coating over repaired fasteners and laps; see metal roof coatings
Retrofit over the old roofOld roof can stay; building must stay dried inNew sub-framing and panels on top; see metal roof retrofit
Tear off and re-panelPanels rusted through, hail-cracked or the wrong profile; wet or failed insulationNew panels, fasteners, closures, trim and usually new insulation

How a re-panel runs

  1. Survey. We walk the roof, fly a drone for photos of areas that are hard to reach safely, and run drone thermal (infrared) scans that help show where water has gotten under the surface. We check purlins, bracing, panel profile, insulation, gutters and every penetration. Every inspection comes with a free digital photo report, so you see what we see.
  2. Measure and form. Panels are formed to the measured length of each run, so most runs have no end laps. We form standing seam and R-panel/PBR in 24 or 26 gauge on our own roll formers, cut to the measured length of each run. Metal lead time is typically 1 to 2 weeks.
  3. Section by section. We open only what we can close the same day, so the building stays dried in.
  4. Insulation. Old faced blanket insulation is often torn or wet; we replace it as we go. When roof insulation is removed, current energy code requirements can apply, and some cities (Mansfield, for example) say so in writing. We confirm the requirement with your city.
  5. Details. New foam closures at eaves and ridge, matched light panels, sealant tape and stitch screws at side laps, new trim and flashings at walls and curbs.
  6. Close out. Gutters and downspouts checked or replaced, debris removed, photos of the finished roof.

Pick the panel for the building

PanelGood forNote
R-panel / PBRMost metal buildings; fits the existing purlin layoutPBR's purlin-bearing leg supports the side lap on open framing
Mechanically seamed standing seamVery low slopes and chronic lap leaksConcealed clips allow thermal movement on long runs
CorrugatedAg and storage buildings, a classic lookSame 24 or 26 gauge choice

Working on occupied buildings

  • Phased around production, docks, inventory or events
  • Dust and debris protection over equipment and stock where needed
  • Same-day dry-in on every opened section
  • We send certificates of insurance before work starts; tell us your requirements with the bid request.

Hail-damaged metal buildings

Hail can dent panels without making them leak, or crack light panels and paint so rust follows. We document both. We document the damage with photos and measurements and can be on the roof when your adjuster inspects. We don't adjust or negotiate claims; you work the claim with your insurance company. Texas law requires you to pay your deductible, and we never waive or rebate it. In Texas you generally have 1 year from the date of loss to file; check your policy.

Owner Blake Snow brings 30 years of commercial and industrial roofing, including casino properties on the Mississippi Gulf Coast such as the Imperial Palace job in 2006, right after Hurricane Katrina, and full exterior and interior rehabs on national-brand hotel properties around the DFW Metroplex. We're certified with GAF, CertainTeed, Owens Corning, Atlas, Johns Manville, Carlisle, Tropical Roofing Products, Mule-Hide and Enviroshake, and many other roof manufacturers. Both 10-year and 20-year manufacturer NDL (no-dollar-limit) warranties are available on commercial jobs. The price depends on which term you choose, and the manufacturer issues an NDL warranty only after its own inspection. We offer same-day response in almost every case, and we answer leak and storm calls 24/7 at (817) 733-9228.

Up to: commercial R-panel · commercial metal roofing · on-site roll-formed panels · 26 gauge commercial metal. For barns and shops: barndominium, shop and ag roofs.

Code sections and standards are summarized in plain English from the published documents. Your building official, the manufacturer's current specification and the warranty document have the final word.

Commercial warranty: a workmanship warranty from 10 years up to lifetime, depending on the job, plus both 10-year and 20-year NDL (no-dollar-limit) manufacturer warranties (the price depends on which NDL term you choose). Manufacturer coverage depends on the product and brand, and on the project qualifying for that manufacturer's program. We put the exact warranty for your roof in writing.

Certified, with 30 years installing every major roofing brand, a family roofing business going back 75 years, and over $80 million in completed roofing projects. 5.0 stars on Google at all three of our offices.

Request a free inspection or call (817) 733-9228. Small repairs are welcome too.

Frequently asked questions

Should we re-screw, coat or replace our metal building roof?

Re-screw when the panels are sound and leaks are at fasteners and laps; coat when the panels are sound but aging; retrofit or re-panel when panels are rusted through, hail-cracked or the insulation has failed. We price the options side by side.

Can you replace R-panel while we keep working inside?

Yes. We open only what we can close the same day and phase the work around your operations.

Do you make your own R-panel?

Yes. We form R-panel, PBR and standing seam on our own roll formers in 24 or 26 gauge, cut to the length of each run. Lead time is typically 1 to 2 weeks.

Do we need new insulation?

Often. Old blanket insulation is usually torn or wet by the time panels fail, and when roof insulation is removed, current energy code requirements can apply. We confirm the requirement with your city.

What warranties do you offer on a metal building re-roof?

Our workmanship warranty runs from 10 years up to lifetime, depending on the job, and 10-year and 20-year NDL options are available on qualifying commercial systems.

How fast can you respond to a leak?

Same-day response in almost every case, and we answer leak and storm calls 24/7 at (817) 733-9228.

Get a free estimate

Tell us how to reach you. Blake or the team will call you back.

Or call (817) 733-9228 snowexteriors@gmail.com